That’s a similar way they sort the bouy positions at moers in Germany. The pontoon is fastened to the bank made from scaffolding. Then everything else is attached to this. So the track never changes
Hi all
I agree that the course should be as near to Naviga length as poss.
However the triangle course is not needed.
We agreed some time ago to run the M course.